
LR034637 LR042893 Radiator Coolant Hose For LAND ROVER RANGE ROVER IV
Product Details:
|
|
Place of Origin: | GUANGZHOU ,CHINA |
---|---|
Brand Name: | AFCS |
Certification: | ISO9001 |
Model Number: | UBC500101、UBC500100 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 5pcs |
Price: | negotiable |
Packaging Details: | Netural or customized |
Delivery Time: | 3-20days |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 30000pcs/month |
Detail Information |
|||
Product Name: | OIL COOLER | Network Size: | 167x82x74 |
---|---|---|---|
Mesh Width: | 82mm | Mesh Depth: | 74mm |
Cooling Mode: | Water-cooled | Car Model: | For Land Rover DISCOVERY IV (L319) 3.0 |
Warranty: | 60000 Kilometers | Material: | Aluminium |
Year: | 2006-2010, 2011-2019 | ||
Highlight: | UBC500100 Oil Cooler,UBC500101 Oil Cooler |
Product Description
Car Model | Year | Engine | CC | KW | Type |
LAND ROVER DISCOVERY IV (L319) 3.04x4 | 2013-2018 | 306PS | 2995 | 250 | Closed Off-Road Vehicle |
LAND ROVER DISCOVERY IV (L319) 3.0 SDV6 SE 4x4 | 2009-2018 | 306DT | 2993 | 188 | |
LAND ROVER DISCOVERY IV(L319) 3.0 TD 4x4 | 180 | ||||
LAND ROVER DISCOVERY IV (L319) 3.0 TD 4x4 | 2012-2018 | 183 | |||
LAND ROVER DISCOVERY IV (L319) 3.0 TD 4x4 | 2009-2018 | 200 | |||
LAND ROVER DISCOVERY IV (L319) 3.0 TD HSE SDV6 RAW 4x4 | 2010-2018 | 155 | |||
LAND ROVER DISCOVERY IV VAN(L319) 3.0 TD 4x4 | 2011-2017 | 188 | Van | ||
LAND ROVER DISCOVERY IV VAN (L319) 3.0 TD 4x4 | 180 | ||||
LAND ROVER DISCOVERY IV VAN (L319) 3.0 TD 4x4 | 155 | ||||
LAND ROVER RANGE ROVER SPORT I(L320) 3.0 D 4x4 | 2010-2013 | 155 | SUV | ||
LAND ROVER RANGE ROVER SPORTI(L320) 3.0 D 4x4 | 2009-2013 | 180 | |||
LAND ROVER RANGE ROVER SPORT I(L320) 3.0 D V6 HSE 4x4 | 2012-2013 | 183 | |||
LAND ROVER RANGE ROVER SPORT I(L320) 3.0 TDV64x4 | 2011-2013 | 188 | |||
LAND ROVER RANGE ROVER SPORT I(L320) 3.6 TD 84x4 | 2006-2013 | 368DT | 3628 | 200 |
Pictures:
FAQ:
Q1. What is your terms of packing?
Generally, we pack our goods in neutral white poly bags and kaqhi boxs. If you have special requirments for box ,the packges is negotiable.
Q2. How about your delivery time?
Generally, it will take 15 to 50 days to finish producing after receiving your deposit.
Q3. What is your terms of payment?
30% deposit before production ,70% of total amount should be paid before delivery.
Enter Your Message