
OEM 7H0820411D 7H0820411C AIR CONDITIONING CONDENSER FOR MERCEDES-BENZ GL-CLASS X166
Product Details:
|
|
Place of Origin: | GUANGZHOU ,CHINA |
---|---|
Brand Name: | WELLBUFF |
Certification: | ISO9001 |
Model Number: | Z622-15010 ZJ01-15-010B |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 5pcs |
Price: | negotiable |
Packaging Details: | Netural or customized |
Delivery Time: | 2-8days |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 30000pcs/month |
Detail Information |
|||
Engine: | ZJ-VE,ZJ46 | Car Model: | For MAZDA 2 (DE,DH)1.3 (DE3FS) |
---|---|---|---|
Warranty: | 60000 Kilometers | Package: | Netural Or Customized |
Year: | 2007-2015、2010-2015 | ||
Highlight: | ZJ01-15-010B Car Engine Water Pump,Z622-15010 Car Engine Water Pump |
Product Description
Product details:
Driver type: Mechanical
Supplementary/Supplementary information: with seal
Pump structure: for v-ribbed belt use
Water pump impeller material: Sheet Steel
Car Model | Year | Engine | CC | KW | Type |
MAZDA 2 (DE,DH)1.3 (DE3FS) | 2007-2015 | ZJ-VE,ZJ46 | 1349 | 63 | Hatchback |
55 | |||||
MAZDA 2 (DE_,DH_)1.3 BiFuel | 2011-2014 | ZJ-46 | |||
MAZDA 2 (DE,DH)1.3 BiFuel | 62 | ||||
MAZDA 2 (DE,DH)1.3 MZR(DE3FS) | 2010-2015 | ZJ-VE,ZJ46 | |||
MAZDA 2 (DE,DH)1.5 (DE5FS) | 2007-2015 | ZY-VE | 1498 | 83 | |
MAZDA 2 (DE_,DH)1.5(DE5FS) | ZY-VE,ZY66,ZY84 | 76 | |||
MAZDA 2 (DE,DH)1.5 MZR(DE5FS) | 2011-2015 | ZY-VE,ZY05,ZY66 | 75 | ||
MAZDA 2 Saloon (DE)1.3 | 2010-2015 | ZJ07 | 1349 | 63 | Saloon |
MAZDA 2 Saloon (DE)1.5 i | ZY-DE,ZY-VE | 1498 | 76 | ||
MAZDA 3 (BK)1.3 (BK14) | 2003-2009 | ZJ-VE,ZJ07,ZJ30,ZJ32 | 1349 | 62 | Hatchback |
MAZDA 3 (BK)1.6 (BK14) | Z601,Z627 | 1598 | 77 | ||
MAZDA 3 (BL)1.6 MZR | 2010-2013 | Z6 | 79 | ||
MAZDA 3 (BL)1.6 MZR(BL14) | 2008-2014 | Z668,Z682,Z683 | 77 | ||
MAZDA 3 (BM,BN)1.6(BM4,BN4) | 2013-2019 | Z6Y1,Z6Y3 | |||
MAZDA 3 Saloon (BK)1.6 (BK12) | 2004-2009 | Z601,Z627 | Saloor | ||
MAZDA 3 Saloon (BL)1.6 MZR(BL12) | 2008-2014 | Z668,Z682,Z683 | Saloon | ||
MAZDA 3 Saloon(BM,BN)1.6 | 2013-2019 | Z6Y1,Z6Y3 |
Pictures:
FAQ:
Q1. What is your terms of packing?
Generally, we pack our goods in neutral white poly bags and kaqhi boxs. If you have special requirments for box ,the packges is negotiable.
Q2. What is the MOQ?
Normally we can supply any quantity if we have stock.
Q3. What is your terms of payment?
30% deposit before production ,70% of total amount should be paid before delivery.We'll show you the photos of the products and packages before you pay the balance.
Enter Your Message