
33326770749 33326768268 33326774793 Control Arm For BMW 5 E60 520 i
Product Details:
|
|
Place of Origin: | GUANGZHOU ,CHINA |
---|---|
Brand Name: | AFCS |
Certification: | ISO9001 |
Model Number: | 17127580957 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 5pcs |
Price: | negotiable |
Packaging Details: | Netural or customized |
Delivery Time: | 2-8days |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 2000pcs/month |
Detail Information |
|||
Reference No.: | 17127580957 | Car Model: | For BMW 5(F10) 530i 535i F07 F11 |
---|---|---|---|
Warranty: | 12 Months | MOQ: | 5pcs |
Size: | STANDARD, OEM Standard | Package: | Netural Or Customized |
Color: | As Shown | Year: | 2010-2016, 013-2016 |
Highlight: | 17127580957 Radiator Hose,BMW F10 Radiator Hose,BMW F11 Radiator Hose |
Product Description
Installation position: Upper
Length: 1:344mm
Width 1:191mm
Height 1:122mm
Color: Black
Weight: 369g
Applicable model:
Car Model | Year | Engine | CC | KW | Type |
BMW 5(F10) 530i | 2010-2016 | N55 B30 A | 2979 | 225 | Saloon |
BMW 5(F10)535i | 2013-2016 | 240 | |||
BMW 5(F10) 535 i xDrive | |||||
BMW 5(F10) 535 i xDrive | 2011-2016 | 225 | |||
BMW 5 Gran Turismo (F07) 535 i | 2009-2017 | Hatchback | |||
BMW 5 Gran Turismo (F07) 535 i xDrive | 2010-2017 | ||||
BMW 5 Touring (F11)535 i | Estate | ||||
BMW 5 Touring(F11) 535 i xDrive | 2011-2017 | ||||
BMW 6 Convertible (F12) 640 i | 2011-2018 | 235 | Convertible | ||
BMW 6 Convertible (F12) 640 i xDrive | 2013-2018 | ||||
BMW 6 Coupe(F13)640 i | 2011-2017 | Coupe | |||
BMW 6 Coupe(F13) 640 i xDrive | 2013-2017 | ||||
BMW 6 Gran Coupe(F06)640i | 2012-2018 | ||||
BMW 6 Gran Coupe (F06) 640 i xDrive | 2013-2018 | ||||
BMW 7(F01,F02, F03, F04) 740 i, Li xDrive | 2012-2015 | Saloon | |||
BMW 7(F01, F02, F03, F04) 740 L |
Product picture:
Packing:
We will pack by wooden box as picture if we have many boxes .
FAQ:
Q1. What is your terms of packing?
Generally, we pack our goods in neutral white poly bags and kaqhi boxs. If you have special requirments for box ,the packges is negotiable.
Q2. How about your delivery time?
Generally, If we have stock ,we can ship it immediatly after received balance ,if not ,it will take 20 to 40 days to finish producing after receiving your deposit.
Q3. What is your terms of payment?
30% deposit before production ,70% of total amount should be paid before delivery.
Enter Your Message